A main machine and a control cabinet may be two transport packages but one usable asset to the Brazilian buyer. Have engineering identify the relationship and any cables or installation accessories before approving a split.
Give each case a package ID and retain a common equipment reference. Describe the actual cabinet configuration. If a repair or substitution changes an identifier, reconcile it rather than reusing another model's document or an old serial number.
Provide dimensions, weight and handling needs separately. The main unit may need lifting while the cabinet needs protection from compression and vibration. Check that the destination can unload both packages with appropriate equipment.
If the buyer requests the machine first but cannot commission it without the cabinet, compare dates for a usable complete delivery rather than arrival of the main case alone. Early arrival may merely consume storage and add another handover.
Identify which package contains installation documents and retain an electronic copy. An early unit still needs usable identification. Leave technical testing to qualified owners while logistics records handover.
Keep package receipt separate from technical acceptance. Logistics cannot certify commissioning, but it can show exactly which package and accessories have arrived and which remain outstanding.