Brazil's waterway regulator scheduled a November 17 briefing for its consultation on vessel chartering rules for cabotage and offshore support. The consultation does not replace actual bookings. Importers using a Brazilian coastal connection need separate visibility of the main leg, transfer and final arrival.
Ask whether the intermediate port is a simple transshipment or a handover to a separate service. Main-vessel arrival is not confirmation that the next vessel has loaded the box. Check discharge, accepted connection and the next update. Keep estimates distinct from completed events.
If the feeder changes, identify the affected leg and any revised terminal, storage or collection requirement. Do not restart the entire delivery estimate from the first departure. Establish charges from the actual service terms, not the consultation.
If the buyer uses one ETA field, enter the port that actually controls destination collection. Record intermediate status in a separate note so main-vessel arrival does not trigger a truck prematurely.
For a low-frequency feeder, ask when the next workable connection might be if the planned one is missed. A small gap on a schedule is not evidence the cargo can physically transfer. Correct any misunderstanding about the intermediate port before dispatch so the buyer does not send a truck there.
Ask the forwarder to include voyage, location and next owner in each update. The essential information is where the cargo is, what connection is confirmed and when the buyer must act.